Department:
CAO

Date:
7/8/2021
Contact:
Carla B. Hass

Phone:
520-621-4609

EL DORADO COUNTY TO MAKE INTERSECTION IMPROVEMENTS AT

SILVA VALLEY PARKWAY AND HARVARD WAY 


(PLACERVILLE, CA) -- El Dorado County's Department of Transportation will be performing road work at the intersection of Silva Valley Parkway and Harvard Way in El Dorado Hills beginning the week of July 12 through September 30, 2021. The construction work will require occasional lane and shoulder closures for which motorists should expect delays.


The closures are necessary to ensure motorist and worker safety while the County's contractor constructs additional capacity in right and left turn pockets in both directions and adding a southbound through lane at the intersection on Silva Valley Parkway. Additionally, the project will improve bike lanes, Americans with Disabilities Act (ADA) requirements at the crosswalks and curb ramps, and optimize the traffic signals for safety and efficiency.


Every effort will be made by the County's contractor to minimize any impacts to school drop off and pick up times while school is in session.


Motorists are advised to slow down through the work zone and expect delays during reversing traffic control.  Motorists are also advised to allow extra time when traveling through the work zone in order to arrive at their destinations on time.

 

The County sincerely appreciates the cooperation and patience of motorists that use this roadway and we apologize for any inconvenience as a result of these closures.

 

For questions regarding this construction, please contact the County's Transportation main line at (530) 621-5900 (select Option 3 for Engineering).

 PR 21-25 image.jpg

###

 

Providing safe, healthy and vibrant communities; respecting our natural resources and historical heritage.