| Authority
to Construct Permits
The AQMD issues Authority
to Construct permits for El Dorado County. Authority
to Construct Permits address stationary sources and are
required for all commercial and industrial projects that
may cause, eliminate, reduce, or control the issuance of
air contaminants. An Authority to Construct permit is required
before construction but is also required if an existing
source is modified. Submitting an application does not guarantee
approval. Permit issuance may take a few months so it is
advisable to contact AQMD early in the project planning
phase. Authority to Construct permits are good for one year
and are renewable one time for one additional year.
AQMD
Stationary Source Fees
Effective July 01, 2009 |
Rule
601 Stationary Source Fees Adopted
July 19, 2005 - Updated each year for CPI |
| Filing Fee:
A fee charged by the District for administrative costs
associated with the submission of an Authority to Construct
application. |
$87
per application |
| Base Processing
Fee: *
The minimum fee charged for engineering time spent by
the District to process and evaluate each authority
to construct or permit to operate application. This
fee shall be the equivalent of two hours of time at
the district’s hourly rate. The engineering fee is $121
per hour, after the 2 hour minimum. |
$329
per application |
| Permit to
Operate Fee: A charge levied by the District for
each permit to operate issued by the District. The fee
shall be the total of the appropriate schedule fee (as
listed on next page) and the calculated fee for the
total tons of each pollutant multiplied by the fee per
ton for that pollutant, as indicated by the following
table. The total tons of each pollutant shall be the
annual permitted emissions rounded up to the next whole
ton. |
|
| Pollutant
Carbon Monoxide (CO)
Nitrogen Oxides (NOx)
Volatile Organic Compounds (VOC)
Sulfur Oxides (SOx )
Total Suspended Particulate (TSP) |
Fee/Ton
$10
$59
$59
$59
$59 |
| Duplicate
Permits: A request for a duplicate permit shall
be made in writing by the permittee. |
$23
per duplicate |
*
Authority
to Construct Application of $329, includes the Filing Fee
($87) plus the Base Processing Fee ($242).
Permit
to Operate Fees
Effective
July 01, 2009 |
|
| Aggregate Plants
|
$1,813 |
| Asphalt Plants
|
$3,303 |
|
Surface Coating Operations
VOC < 520 lb/year
VOC > 520 lb/year |
$405
$588
|
|
Backup Internal Combustion Engines
< 250 Hp
> 250 Hp |
|
| Prime Power
Internal Combustion Engines
< 500 HP
> 500 HP
|
$576
$1.18/HP
|
Boilers
< 5 MMBtu/hr
5 -24 MMBtu/hr
> 25 MMBtu/hr
|
$426
$540
$24 per MMBtu/hr
|
| Gas Flares |
$426 |
Incinerators
< 40 sq ft
>40 sq ft
|
$426
$540
|
| Landfills |
$2,451 |
| Material Handling
and Collection Systems |
$475 |
| Remediation
Systems |
$1,331 |
Vapor Recovery
Systems
Phase I
Phase II
|
$271
$903
|
| Bulk Plants
< 40,000 gal
> 40,000 gal
|
$903
$1,485
|
| Miscellaneous
Equipment |
$405 |
**
Fees subject to change depending on level of emissions.
To contact the AQMD for more information on
construction permits,
EMAIL, or call (530) 621-6662. |